Three stages, in the order the risk runs
Get a staged plan
Tell us what the last report found, or that there has not been one. We call back to arrange the visit that builds the plan.
The staged plan, at a glance
This is the shape most of our plans take for a fireplace that burned wood for decades and is now heading toward gas. The items in each stage change from house to house; the order does not.
- Stage one, before the fireplace is used again: anything that can put exhaust or gas into the room. A damper that can close on a lit log set, a flue cracked where exhaust escapes, a gas joint that leaks, a vent that stops short.
- Stage two, before the next rainy season: the top of the chimney. A cap, a leak traced and stopped, a cricket on a wide stack, the crown made sound.
- Stage three, when the budget allows: the change you actually wanted, such as an insert, a new log set or a remodel of the fireplace face.
Stage one: what cannot wait
These are the items we would not light a fire over. Most are smaller jobs than owners expect: a damper clamp, a connector swapped for a current one, a short vent extended to the top. A cracked flue under a log set is the larger exception, and it often decides whether stage three becomes an insert, since an insert brings its own vent and sidesteps the cracked tile.
Until stage one is done, the plan says plainly that the fireplace should stay off. That line protects whoever lives in the house, and it is the line a buyer's inspector or an insurer will look for first.
Stage two: keeping water out
Water does slow damage. It rusts dampers and burner pans, soaks brick, opens the crown and stains ceilings. None of that is urgent in the way a gas leak is, but in this part of Los Angeles County the winter rains arrive in a few heavy storms, and a chimney that is open at the top takes all of them.
Stage two closes the top: a cap over the flue, leaks traced and stopped, a cricket where a wide chimney holds water on its uphill side. Crown and flashing work sit here too, each priced on its own line.
Stage three: the upgrade
Once the chimney is safe and dry, the gas change can go in on solid ground. For many owners that is an insert in the existing firebox, which turns a drafty opening into a heater. Others want a new log set, or a new face around the opening to go with it. Doing this last means the money goes into a chimney that will not need opening up again a year later.
Prices for each stage
Our published figures for the items that turn up most often across the three stages. Where a job has a range, the written plan says where yours falls. A cap over the flue is quoted after we measure.
- Camera inspection that sets the plan
- $380
- Water entry traced and stopped
- $540 to $3,250
- Diverter on the uphill side
- $430 to $975
- Diverter and fresh roofline metal
- $650 to $1,600
- Sealed gas heater in your firebox
- $2,700 to $5,400
Crown work, liners, dampers, chase covers and flashing on its own carry no published figure. Each one appears as its own line on the written plan once we have looked at it.
Questions about staging
How do you decide which stage an item belongs in?
By what happens if it waits. Anything that can put gas or exhaust into the room goes first. Anything that lets water in goes second. Everything else, including the upgrade, goes last.
Can the stages be done by different contractors?
Yes. The plan lists each item with its own figure, so you can hand any line to someone else. We ask only that stage one is finished before the fireplace is lit.
Will the plan change between stages?
Sometimes. Work in one stage can show something new, such as tile damage behind a stuck damper. When it does, we add a line with its own figure and tell you which stage it belongs in.
Does stage three have to be an insert?
No. It can be a log set, a remodel of the fireplace face, or nothing at all. Some owners finish stage two and leave the fireplace as it is for a while.
Why start with a camera inspection?
Because the plan is only as good as what we can see. The middle of the flue decides whether stage one is a small fix or a larger one, and only the camera shows it.
Turn the long list into three short ones
Send the last report, or tell us there is none, through the contact page and we will set up the visit that builds your plan.
Call (562) 449-0362